TANKS (1st of 3) (last update 4/3/07)

 


 

Fig. 3.1.9 a, b, c, d As of April 2007, all diesel tanks for Joohee are ready to be installed in the hull. All is 4mm Alustar plating with internal buffer, inspection opening is either alustar or 5083. Note also a drainage point at the bottom of the tank - will eventually be drained from the top. A lot of time went into this investigative know-how gaining exercise (see next); if someone happens to have a need for a similar tank, feel free to let us know, we might be able to help and make one (or hundred) for a fraction of time and money you would have to invest otherwise - fully guaranteed.

     

Photograph dates: a, b, 27.12.2006 and for c and d 10.1.2007

 