1.2.1.3.1 Shipyard - Building - Hull - Construction photos - Frames on Rig

 
Page: 1 2 3 4 5


FRAMES on the RIG ( 5th of 5)

 


 

Fig. 3.1.2i,j,k Time to move on, girders, stringers, edge tubes and all that longitudinal members goes in place. And it actually all fits within a millimeter (j), which... to say the least, is better than 0.01% on 14m boat - well done Graham, well done Ladislav. Its actually rather impressive to see the 73mm dia x 5mm 5083-0/H111 aluminium tube to wrap around the boat shape as if it has been waiting for it since it has been extruded.

Dates: 18.8.2004, 24.8.2004 and 1.9.2004 respectively

Level of optimism: boiling.

 

NEXT>>


       
<< PreviousNext >>

 

©2005 QFFF Design • HullBuildingShipyardHome