1.2.1.3.1 Shipyard - Building - Hull - Construction photos - Frames on Rig |
||||||
|
|||||||
| FRAMES on the RIG ( 4th of 5) |
|
||||
| |
|||||
|
|||||
Fig. 3.1.2f,g,h At some point of time, all the frames are in place (f). The structure feels like a jelly-frame-boat. Note the wooden bars between the frames on Fig. 3.1.2g. Invaluable for quick fitting of the frames in place. At this point we had to establish three strongholds, frames which can take all that abuse of holding the rest of frames in place before installing stingers (Fig. 3.1.2h) |
|||||
Dates: 14.7.2004, 30.7.2004 and 30.7.2004 respectively Level of optimism: never better before. |
|||||
NEXT>> |
|||||
| |
|||||