1.2.1.3.1 Shipyard - Building - Hull - Construction photos - Building Rig

 
Page: 1 2 3 4


BUILDING RIG (4th of 4)

 


 

Fig. 3.1.8i,j Just to simplify life of once to be a future PhD student in history of yacht industry... this used to be a house (kind of) and after knocking down few walls, ceilings and floors in worse work I was involved ever (i), we transformed it to workshop (kind of). Part of the rig structure is also the welding table (j), its leveled 4x2.5m platform with 5mm steel plates on top. Note the welding access gap in the middle between plates. Also note extension of the table bar in the middle part. This was invaluable for big frames which included the keel

     

Dates: 18.1.2004 and 17.4.2004

Level of optimism: we would leave brick and mortar for free Masons next time...

NEXT>>


<< PreviousNext >>

 

©2005 QFFF Design • HullBuildingShipyardHome