PLATING (3rd of 5)

 


 
Fig. 3.1.3g,h,i Plates might be ready, frames are not. Decreasing with toluene, oxide removal and limber holes cutting is less qualified work the CEO is capable of doing (g), finely the plate sits on the frames within a hand pressure away (h), first layer of plates in place (i); even these seemingly flat panels need some amount of stretching on English wheel. As shown, we started from sheer to bottom plating to reinforce the structure before the heavy bottom plates on the top are installed.      

Dates: 7.10.2004, 28.10.2004 and 28.10.2004 respectively

Level of pessimism: null, diligence high, dew point low...