|
1.2.1.3.1 Shipyard - Building - Hull - Construction photos - Keel & Ballast |
||||
|
|||||
| KEEL and BALLAST (2nd of 3) | |||||
| |
|||||
|
|||||
Fig. 3.1.5e,f,g,h After fitting the drainage tube (e), plates goes on (f) and voala the keel looks like a keel (g, h) and final welding can commence. . |
|||||
Dates: 27.5.2005, 8.6.2005, 8.6.2005 and 8.6.2005
|
NEXT>> |
||||
| |
|||||
| << Previous Next >> |
| ©2005 QFFF Design | Hull Building Shipyard Home |