|
1.2.1.3.1 Shipyard - Building - Hull - Construction photos - Single Frames |
||||||
|
|||||||
| SINGLE FRAMES ( 4th of 5) |
|
||||
| |
|||||
|
|||||
Fig. 3.1.1h,i,j From sheer joy of another frame finished (h), through beginning of madness of yet another frame finished (i) to opening wings of a pure imagination through mythological Leonardo's initiation (j)... those are the dates our CTO went through before he got reborn into a welding automaton |
|||||
Dates: 5.4.2004, 14.4.2004 and 21.4.2004 respectively Level of sanity: very low |
|||||
NEXT>> |
|||||
| |
|||||
| << Previous Next >> |
| ©2005 QFFF Design | Hull Building Shipyard Home |