1.2.1.3.1 Shipyard - Building - Hull - Construction photos - Deck |
|||||||
|
||||||||
| Deck (1st of 6) 22.7.2006 |
|
||||
| |
|||||
|
|||||
Fig. 3.1.7a,b,c,d Coaming is welded to the sheer tube and coaming tube, 14x8=112m of welding, nearly two weeks of work and climbing exercise (a,b). Progress however goes on and the size and shape of the deck slowly emerges in the mist (c). Emergency steering cover ready for final welding (d).
|
|||||
Dates: pictures taken on the 14th of July, 2006
|