1.2.1.1 Shipyard - Building - Hull - Lead

 
Page: 1 2  


Lead ... (last update 03/07/07)

Fig. 1.3 a, b, c, d. Four tons of lead - looks like one, feels like ten (a). Lead cutting was done with horizontal jig saw, model 1940 (spot the green something in (a)). All 300+ cuts were done with a single blade - luckily no problem encountered here (b). Lead boiling pot (c) and first layer of lead in one of five keel compartments (d)

Photos taken on: 12.6.2007, 12.6.2007, 19.6.2007 and 21.6.2007

 

NEXT>>


 
<< PreviousNext >>

 

©2005 QFFF Design • HullBuildingShipyardHome